Our installation standards

Ten rules every Manatee job follows

We hold every installation to the same standards, whoever is on site. Inspectors around Greater Boston check for most of them, and nobody wants a second inspection.

01

Clearance at the disconnect

Leave at least 30 inches of width and 36 inches of standing room in front of every electrical disconnect.

02

Clearance at the panel

Keep 36 inches of working space on the side a service panel opens from, since it may be energized. Less only with the inspector's approval in advance.

03

Code comes before the manual

Clearances in a manufacturer's installation manual don't override code-required clearances.

04

Multifamily-rated wiring

In buildings with three or more units, use multifamily-rated communication wiring, such as Duckt Strip or jacketed metal-clad cable, for both ductless and ducted systems.

05

Sealed electrical enclosures

Use proper cable connectors to seal the heat pump's electrical enclosure, including Duckt Strip connectors where needed. Liquidtight conduit isn't required, but it's recommended in some cases.

06

Licensed electrical work only

No electrical work without a valid license.

07

A Manual J on every job

Size mini-splits to the heating load from a Manual J, and size any new ductwork from the calculated CFM.

08

No oversizing

Don't oversize the equipment or exceed the electrical load calculation. If the new load is close to the main breaker or the building's service capacity, run the calculation.

09

Respect the electrician

Coordinate with the electrician on the job and respect their work. It keeps the project, and the inspection, on track.

10

Pressure test and deep vacuum

Never release refrigerant without first pressure testing with nitrogen and pulling a deep vacuum.

Based on the National Electrical Code and local inspection practice. Where an inspector approves an alternative in advance, we follow the inspector.

Work With Manatee

We get job and handle all admin work

Scheduling, parts ordering and delivery, and more - so you can focus on what you’re best at. Installing high quality systems.

More consistent stream of work

Enjoy a steady flow of work, giving you the stability and peace of mind you need to focus.

We minimize the risk 
to your business

By managing customer payments, credit card fees, financing, and change orders.

We value long term relationships

To installers who value and take pride in their work. 
We have high expectations just like you.

Our Service Areas

Eastern Massachusetts
(Primarily Boston Metro)

Contractor FAQs

We value your time and the effort you put in to applying for a role, so we’ll do our best to make your application and interview process as enjoyable as possible.

How the application process looks like?
Do I need to provide my own parts and equipment?
What kind of volume can I expect?
What happens if there are issues or change orders during a project?

Apply for Manatee

Ready to take the next step? 
Join us and experience the benefits of Manatee firsthand.