
Ducted + Ductless in West Newbury
This two-story West Newbury home dates to 1830 and was heated by an oil boiler and baseboard, with window units for cooling. The owner wanted to get off oil entirely, so the job included removing the boiler and the oil tank along with installing the new heat pump system.
The design
This is a classic mixed scenario. Part of the first floor sits over a full basement, which is ideal for a small ducted system. The rest of the house sits over a crawl space, where ductless makes far more sense. So we split the house into two systems, each on its own outdoor unit:
- Ducted: a Mitsubishi SVZ-AP18NL multi-position air handler in the basement, paired with an 18k SUZ-AA18NLHZ Hyper-Heat outdoor unit, feeding all-new ductwork to the rooms above the basement.
- Ductless: a Mitsubishi MXZ-SM36NLHZ Hyper-Heat multi-zone outdoor unit running four wall-mounted heads, covering the living and dining room, the sunroom, and both upstairs bedrooms.
The install
Removing the boiler and its piping cleared room in the basement for the new ductwork. We got the ductless system running first so the house had heat right away, then built out the ducted side. The install took about four days in early October, timed for fall weather and long enough days to make the drive out to West Newbury worthwhile.
1830 two-story, 3-bedroom home in West Newbury heated by an oil boiler and baseboard, with window AC, looking to get off oil completely.
Hybrid system on two Mitsubishi Hyper-Heat outdoor units: an SUZ-AA18NLHZ paired with an SVZ-AP18NL ducted air handler and new basement ductwork, plus an MXZ-SM36NLHZ multi-zone running four wall-mounted heads. Oil boiler and tank removed.
Completed in about four days in October 2026. Fully off oil, with whole-house heating and AC from a ducted/ductless mix matched to what's under each part of the house.







