Ductless in Medford
This 1929 two-story home in Medford was heated by a gas boiler and baseboard, with window units for summer. The owners wanted to move the whole house to heat pumps and get real air conditioning in the process.
The design
One Daikin Aurora cold-climate 5-zone outdoor unit runs the whole house. Downstairs, three wall-mounted heads cover the living room, the first-floor bedroom, and the open kitchen and dining area. Upstairs, we went with two floor consoles instead of wall units, one in the office and one in the bedroom, which suited the layout of those rooms better.
The install
One line run was genuinely difficult: getting refrigerant lines to the front of the house. We worked it out by running the lines down the side of the house, through the porch deck, and into the basement, where they could cross over to the other side of the house. It's a good example of something that matters a lot with ductless systems: finding smart line routes during the design phase, before anyone picks up a drill.
Floor consoles also take more work than wall units, with longer line runs and carpentry to mount them low on the wall. All told, about 130 feet of line set went in, and the crew finished in about four days at the end of March.
1929 two-story home in Medford heated by a gas boiler and baseboard, with window AC, converting the whole house to heat pumps.
1 Daikin Aurora cold-climate 5-zone outdoor unit serving three wall-mounted heads downstairs and two floor consoles upstairs, with about 130 ft of line set.
Installed in about four days. Whole-house heating and AC, with a tricky front-of-house line run solved by routing through the porch deck and basement.